KEITH HAY PARK PLAYGROUND
This project was completed in 2013.
Playground design in collaboration with Catherine Hamilton and Tina Dyier.
I was highly involved in the concept design, development design, cost & quantity estimate, detail drawing package, preparation of contract documentation, drawing package for tender submission & finally the construction detailed design set.
I also took part in the numerous site inspections & coordination with the main contractor during the construction phase and the production of practical completion report.